The works in the area surrounding the Carapacho Pool on the island of Graciosa have been concluded.
This beach area now meets all the conditions it had before the bad weather conditions that caused damages last winter.
The Government, through the Regional Secretariat for Tourism and Transport, has carried out several interventions on the site, including the consolidation of walls, the repair of pavements and the removal of the old structure that collapsed into the pool.